Tuesday, 2 August 2011

Next level is achieved

The first floor is now for the first time in the primer. This must be done tree times before we can finish with the topcoat. It needs each time a day drying before the next layer can be applied. We made a start with the removal of the old paint of the ground floor. So with a bit of luck we can paint the ground floor  for the first time this Thursday. Our hope is to finish the complete project next Monday. Then we only have to make a move to the other side of our house to clean the wall with our pressure washer. The bricks are never cleaned and they are almost black of all the dirt of the passing traffic.

2 comments:

  1. Hi Flora, I'm back in the Netherlands now. I'll write more later, but I'm glad to see you have made some progress with your house. A good post, but like me, your word order is sometimes wrong. I'll do the corrections this evening.

    ReplyDelete
  2. The first floor is now in the primer for the first time. This must be done three times before we can finish with the topcoat. It needs drying for a day before the next layer can be applied. We made a start with the removal of the old paint on the ground floor. So with a bit of luck we can paint the ground floor for the first time this Thursday. Our hope is to finish the complete project next Monday. Then we only have to make a move to the other side of our house to clean the wall with our pressure washer. The bricks have never been cleaned and they are almost black with all the dirt from the passing traffic.

    ReplyDelete